Dec 10, 2024
CWHI Ceremony Commemorates First Cutting of COMP2 Piles

CWHI was delighted to host representatives of Saipem S.p.A at our Xiangshui Yard in China recently for a ceremony to mark the first cutting of Piles destined for the North Field Production Sustainability (NFPS) Offshore Compression Complexes “COMP2” Project.

CWHI Team at the NFPS COMP2 First Cutting Ceremony in Xiangshui

 

CWHI's scope for this phase includes producing 25,000 metric tons of piles with outer diameters ranging from 1,524mm to 3,050mm, lengths between 23m and 73m, and wall thicknesses between 30mm and 100mm.

 

Dale Young, Executive Director at CWHI, commented, “We are proud of our continued contribution and involvement in this significant large scale energy infrastructure project in the Middle East region. It is always a pleasure to host our clients on occasions such as this, especially so in the case of Saipem, a long-standing CWHI customer.”

 

The COMP2 Project is part of the NFPS Offshore Compression development that encompasses the installation of new assets in Qatar's North Field, including compression complexes at a number of locations to sustain gas supply to the existing liquefied natural gas (LNG) production trains.

Cutting of the first COMP2 Plate in Xiangshui

 


About CWHI

 

CNOOD-Wenchong Heavy Industries Co., Ltd. (CWHI), headquartered in Guangzhou, Guangdong Province, China, is a world leading solution provider specialising in the large scale manufacturing for offshore energy, renewable energy, oil and gas applications, infrastructure and mining.

 

With over 40 years of experience, CWHI has an extensive track record supplying complex projects globally for the energy sector. CWHII's core business sectors include: large scale structural fabrication, engineering, resources integration, supply chain management, project management, global logistics and financing.

 

We are Ahead for Energy, proudly contributing to the world's transition towards sustainable energy.

Go Back to Newsroom
July 14, 2025
Visit CWHI at Australia Wind Energy 2025 – Booth A101
cwhi
Read More
July 7, 2025
CWHI, Powering the Future with Floating Wind
cwhi
Read More
June 24, 2025
Celebrating a Major HSE Milestone on the Inch Cape Offshore Wind Farm
cwhi
Read More
June 20, 2025
CWHI Showcases Strength and Progress at GOW25
cwhi
Read More